Facade installation for Henkel’s central warehouse

For the facade installation for the new central warehouse of Henkel, the CladBoy compact GB2-375 was used successfully. The central warehouse is the world’s largest fully automated storage centre with a total floor area of 16,000 m² with 10 floors and a capacity of 90,000 pallet places.

Minimum effort required
The facades are constructed of sandwich panels with a rock wool core, delivered and installed by the firm Brucha. This compact vacuum lifter is fitted with a dual vacuum system, so that secondary safety devices are not necessary. Because of this, the heavy sandwich panels (circa 300 kg and a length of circa 12 m) could be installed quickly, with minimal utilization of personnel, in an efficient way.

Minimum effort required
The facades are constructed of sandwich panels with a rock wool core, delivered and installed by the firm Brucha. This compact vacuum lifter is fitted with a dual vacuum system, so that secondary safety devices are not necessary. Because of this, the heavy sandwich panels (circa 300 kg and a length of circa 12 m) could be installed quickly, with minimal utilization of personnel, in an efficient way.

Less about this project

Arrow

The CladBoy compact GB2-375 is used in this project.

See other projects

Our website uses cookies for better functionality, as well as to improve the performance and user experience we provide, and to increase the relevance of our offers. If you agree with our cookie policy, please click “I agree.”

Here you can read our privacy statement and cookie policy.

Some contents or functionalities here are not available due to your cookie preferences!

This happens because the functionality/content marked as “%SERVICE_NAME%” uses cookies that you choosed to keep disabled. In order to view this content or use this functionality, please enable cookies: click here to open your cookie preferences.