+31 348 - 449 660

Phone

Facade installation for Henkel’s central warehouse

For the facade installation for the new central warehouse of Henkel, the CladBoy compact GB2-375 was used successfully. The central warehouse is the world’s largest fully automated storage centre with a total floor area of 16,000 m² with 10 floors and a capacity of 90,000 pallet places.

Minimum effort required
The facades are constructed of sandwich panels with a rock wool core, delivered and installed by the firm Brucha. This compact vacuum lifter is fitted with a dual vacuum system, so that secondary safety devices are not necessary. Because of this, the heavy sandwich panels (circa 300 kg and a length of circa 12 m) could be installed quickly, with minimal utilization of personnel, in an efficient way.

Minimum effort required
The facades are constructed of sandwich panels with a rock wool core, delivered and installed by the firm Brucha. This compact vacuum lifter is fitted with a dual vacuum system, so that secondary safety devices are not necessary. Because of this, the heavy sandwich panels (circa 300 kg and a length of circa 12 m) could be installed quickly, with minimal utilization of personnel, in an efficient way.

Less about this project

Arrow

The CladBoy compact GB2-375 is used in this project.

See other projects