New roof for storage warehouse
The roof of an existing warehouse was replaced and expanded at the same time. The old roofing was replaced by sandwich roof panels, after which the enlarged area was equipped with solar panels. This was all carried out using the CladBoy CB5.
Using 21-meter-long panels, we were able to span the entire roof construction and did not need to adjust the existing supporting structure. Because the vacuum lifter has suction pads in several locations, the sandwich panels will not bend during lifting. Using the CladBoy CB5 with dual-vacuum technique, additional safety straps are no longer a requirement.
The installation of more than 1,200 m2 of roof panels was carried out by the construction company Lont. The mechanics using the VIAVAC vacuum lifter were very pleased with its convenience and speed.
Watch the instruction video here:
Using 21-meter-long panels, we were able to span the entire roof construction and did not need to adjust the existing supporting structure. Because the vacuum lifter has suction pads in several locations, the sandwich panels will not bend during lifting. Using the CladBoy CB5 with dual-vacuum technique, additional safety straps are no longer a requirement.
The installation of more than 1,200 m2 of roof panels was carried out by the construction company Lont. The mechanics using the VIAVAC vacuum lifter were very pleased with its convenience and speed.
Watch the instruction video here:
Less about this project